A public consultation on the plans, which cover a section of Taunton Road from the Nynehead Road roundabout towards Priory near the town centre, is now live and will close on Friday, 20 November. Residents can submit their comments online or in person.
The team behind the scheme will be available to discuss the proposals at the corner of Fore Street/South Street on Tuesday, 10 November, between noon and 4pm. The proposals include the introduction of three signalised crossings (Toucan crossings), off-road segregated paths with separate lanes for walkers and cyclists, two-way cycle paths where space allows, and an off-road shared path linking to an existing route near Lidl. A new footway is also planned on the south side near Cades Gardens.
Additionally, the speed limit on this section of road is proposed to change from 40mph to 30mph, aligning with the existing 30mph limit in the town centre. On-road cycle lanes with light segregation are also included where space is limited.
These proposals are part of the Local Cycling and Walking Infrastructure Plan's Route 2, connecting Chelston to the town centre and providing a key link to the proposed railway station. The scheme is slated to begin in early 2027, with £573,620 of Section 106 funds secured from the Longforth Farm development.
“"We want to hear from as many people as possible on the proposals to achieve a more attractive and safer way to walk, wheel or cycle in Wellington. The community’s responses will help to show how people feel about the proposals and spot any ideas that may help shape any future schemes."




